Blog, Shipbuilding SAILCARGO INC. Blog, Shipbuilding SAILCARGO INC.

Interior Planking

Interior planking has begun and we are extremely excited! Shipwright and team leader Janek Lindemann sat down with media manager Jeremy Starn to discuss the process of installing the interior planking.

Read More
Shipbuilding SAILCARGO INC. Shipbuilding SAILCARGO INC.

Quarter deck beams complete

The quarter deck beams support this rear deck which adds another level to the ship. There is a large house which sits towards the end of the ship which accommodates the captains and officers quarters, an eating area, map room and workshop. The quarter deck is the upper deck which surrounds this deck house. It it took a team of experienced shipwrights to work out the complex curvature of this unique part of the ship.

Read More
Shipbuilding SAILCARGO INC. Shipbuilding SAILCARGO INC.

Top Deck Beams

See what the team has been up to! Our latest construction update was the complete installation of the top deck beams of Ceiba. Observe the last few months of work through an extensive photo gallery.

Read More
Shipbuilding SAILCARGO INC. Shipbuilding SAILCARGO INC.

Samson Post Installed

This piece is solid Gaupinol (Hymenaea courabril, Jatoba) and will secure Ceiba’s anchor chain. This complicated piece of joinery is notched into the deadwoods and top deck beams. This piece was cut out over a year ago and has been sitting in the ship waiting to be put up!

Video: Raising the Samson Post

Read More
Shipbuilding SAILCARGO INC. Shipbuilding SAILCARGO INC.

Cargo Hatches Finished

Cargo hatch openings were made using traditional timber frame joinery to ensure structural integrity during cargo loading and unloading. Removable floor timbers are used during loading and a watertight cover secures the lower cargo holds. This provides extra security for the cargo and more floor space for the upper cargo hold.

Gallery: Cargo Hatches

Read More
Shipbuilding SAILCARGO INC. Shipbuilding SAILCARGO INC.

Fairing (ongoing)

Fairing of the interior of the ship has been a continuous process for over a year. Interior fairing is important because it ensures the tightness of the interior planking. Having interior flooring not only gives strength to the entire ship but will be make moving cargo much easier.

Video: Fairing
Gallery: Fairing

Read More
Shipbuilding SAILCARGO INC. Shipbuilding SAILCARGO INC.

Finished Stern Deadwoods

The deadwoods are the aftermost massive timbers that create the backbone portions of our ship Ceiba. They are strategically positioned in an interlocking pattern to offer support for the stern half frames, rudder, transom, and propellers. There are twelve deadwoods in total, counting the stern post knee.

Gallery: Stern Deadwoods

Read More
Shipbuilding SAILCARGO INC. Shipbuilding SAILCARGO INC.

Keelson Installed

The keelson has been put up and bolted into place. The massive bolts hold the keelson, frames, and the keel together. Fastening the keelson included drilling and bolting thirty holes, one for every full frame.

Read More